Planned Traffic Impacts on Mille Roches Island
Long Sault Parkway & Moulinette Island Causeway Street Intersection
Crews are currently working on the east end of the Long Sault Parkway on Mille Roches Island, progressing from east to west.
A temporary single‑lane traffic reduction will be in place from the end of May into August 2026, on Mille Roches Island on the Long Sault Parkway, near Mille Roches Beach & Day Use Area (15890 Long Sault Parkway, Long Sault, Ontario K0C 1P0) to support underground construction work.
Campers at Woodlands and McLaren campgrounds, and Woodlands Beach & Day Use Area users, are advised to use the west (Ingleside) entrance of the Long Sault Parkway to access these locations.
On May 28 and/or May 29, 2026, traffic impacts are anticipated at the intersection of the Long Sault Parkway and Moulinette Island Causeway.
During this time:
- Traffic will be maintained using flagging operations and traffic control personnel
- A temporary access route will be in place to help maintain traffic flow
- Short delays are expected between the hours of 7 a.m. and 7 p.m.
SLPC and its contractors will make every effort to minimize disruptions and keep traffic moving safely.
Safety Reminders
For your safety and the safety of construction crews:
- Please keep well back from active work areas
- Respect all barricades, fencing, signage, and posted notices
- Give heavy equipment operators a wide berth at all times
- Keep dogs on a leash, especially near construction areas
- Be mindful of vehicles slowing or stopping in construction zones along the parkway
Background
The St. Lawrence Parks Commission is investing in important infrastructure improvements along the Long Sault Parkway. Green Infrastructure Partners (GIP) have been contracted to complete this work.
Construction has begun on a multi-phase project to install new water and sewer services along the Long Sault Parkway. Work on the east (Long Sault) end, including Mille Roches and Snetsinger Islands, is scheduled to take place from April to November 2026, with work on the west (Ingleside) end continuing into 2027.